Guide

Getting off gas in Victoria, without the panic.

What the rules actually require and when, what your electric options are, and how the VEU rebate brings the cost down. Every fact here is dated and sourced.

Last checked: 29 August 2026

The short version. If your gas heater, hot water or cooktop still works, no one is making you tear it out. Victoria's reforms mostly change what you can install, especially in new homes and when an old appliance finally dies. Reverse-cycle (a heat pump) is the main replacement for gas heating, it heats and cools, and the VEU rebate takes a solid chunk off the price.

One date worth knowing

From 30 September 2026, the minimum out-of-pocket co-payment for a ducted or larger multi-split reverse-cycle system rises from $1,000 to $3,000 (inc GST). If a whole-home switch is on your list, finishing the install before then could save you around $2,000. Smaller systems under 10kW cooling are not affected. (Victorian Government VEU program, checked 29 August 2026.)

Do you actually have to get off gas?

Short answer for most people: not right now, and not by force. Victoria's reforms don't require owner-occupiers to remove working gas appliances. You can keep your gas heater, hot water and cooktop and repair them if they play up.

What's genuinely changing is what you're allowed to put in. New homes have to go electric, new gas connections have lost their subsidy, and from 2027 a dead gas hot water unit has to be replaced with electric. So the switch is less a ban and more a one-way door: once an old gas appliance goes, electric is what takes its place. Knowing that early means you choose on your terms, not in a cold snap with a broken heater.

The actual rules and dates

Here's what's real, with dates:

  • New homes have been all-electric since 1 January 2024 where they need a planning permit. Government buildings went all-electric earlier, from July 2023.
  • New gas connections lost their subsidy on 1 January 2025. You now pay the full up-front cost of a new connection, and since April 2024 gas networks can't offer sign-up inducements.
  • From 1 January 2027, building electrification rules broaden, including new commercial buildings (outside industry, manufacturing and agriculture).
  • From 1 March 2027, end-of-life gas hot water must go electric. Under reforms announced in 2025, when a gas hot water system reaches the end of its life it is to be replaced with an electric one. The final regulations are still being settled, so confirm the detail with a licensed installer.
  • Renters get stronger protections from 2027. Landlords must replace a gas hot water system or heater with electric when it's beyond repair, meet minimum efficiency standards, and provide electric cooling in living areas.
  • Owner-occupiers keep their choice. There is no rule forcing you to change working gas cooking or heating.

Why plan ahead, if you don't have to?

Two reasons. First, the direction is fixed: every rule above points one way, so the next appliance you install is very likely to be electric whether you plan for it or not. Second, replacing a dead heater in the middle of winter means taking whatever you can get fast, at whatever price. Deciding while your current system still runs lets you size it properly, get a real quote, and claim the rebate calmly.

Your electric options

For most Melbourne homes getting off gas, the choices are straightforward:

  • Reverse-cycle air conditioning is the main one. It's a heat pump that both heats and cools, and it runs far more efficiently than gas heating. A ducted or multi-split system does the whole home; a single split handles one room or a couple of key spaces.
  • Heat-pump hot water replaces a gas hot water unit and is the electric option the reforms point to for hot water.

Which is right depends on your home's layout, insulation and how you use each room. That's exactly what a good installer sizes on site.

What does it cost?

Honestly, it depends. A single split system is a modest job; a whole-home ducted or multi-split replacement is a bigger one. The two things that move the number most are how many rooms you're heating and cooling, and the system size your home needs.

The good news is the VEU rebate takes a real chunk off, and your installer builds it straight into the quote so you see the discounted price, not a form to chase later. For the rebate detail and indicative figures, see the VEU rebate guide, and for how the running costs stack up, the gas vs reverse-cycle guide.

The VEU rebate, in brief

The Victorian Energy Upgrades (VEU) program gives you a discount on an efficient electric system, delivered through an accredited provider who handles the paperwork. You sign a short consent form and the rebate comes off your invoice up front.

The one moving part worth watching is the co-payment change on 30 September 2026 described above: for ducted and larger multi-split systems the minimum out-of-pocket rises from $1,000 to $3,000 including GST, and there's a 20kW cap on the capacity that earns a rebate. The full VEU guide walks through who's eligible, how much you can expect, and how to claim.

How the switch actually works

Through a matched installer, it's roughly this:

  • A quote that already shows the rebate deducted, so you see your real price.
  • You pick an install date.
  • The old gas appliance is decommissioned and the new system installed, with an Electrical Certificate of Safety issued.
  • Your accredited installer lodges the VEU paperwork. Your only job is to sign the consent form.

Questions people ask

Do I have to rip out my working gas heater now?

No. Victoria's reforms don't force owner-occupiers to remove working gas cooking or heating. You can keep and repair what you have. What changes is what you're allowed to install, mainly in new homes and when an old appliance reaches the end of its life.

Is reverse-cycle any good in a Melbourne winter?

Yes. Modern reverse-cycle (heat pump) systems are built for climates like Melbourne and heat efficiently through winter. They are the main replacement the Victorian roadmap points to for gas heating, and one system both heats and cools.

What happens when my gas hot water unit dies?

Under reforms the Victorian Government announced in 2025, from 1 March 2027 a gas hot water system that reaches the end of its life is to be replaced with an electric one, such as a heat-pump hot water system. The VEU program can help with the cost. Confirm the final rules with a licensed installer, as regulations are still being settled.

Will I be forced off gas cooking?

No. The reforms state there are no changes to gas cooking for owner-occupiers. If you love cooking with gas, you can keep it.

I rent. What changes for me?

Rental rules tighten from 2027: when a gas hot water system or heater is beyond repair it must be replaced with electric, minimum energy-efficiency standards apply, and living areas are to have electric cooling. These are landlord obligations, not costs you have to fund as a tenant.

Is now a better time because of the rebate?

For a ducted or larger multi-split system it can be. From 30 September 2026 the minimum out-of-pocket co-payment rises from $1,000 to $3,000 including GST for those systems, and it applies to installs completed and accredited before that date, not just quoted. Smaller systems under 10kW cooling stay at $1,000. Always confirm current figures with your installer.

Thinking about the switch? Start with a real number.

Get matched with one local
Sources
  • Victorian Government, Victoria's Gas Substitution Roadmap, energy.vic.gov.au (checked 29 August 2026).
  • Victorian Government, Victorian Energy Upgrades, space heating and cooling change from 30 September 2026, energy.vic.gov.au (checked 29 August 2026).
  • ABC News, Victorian gas reforms, 24 June 2025, abc.net.au.
Find my installer